GuidesRoofers
Free quote template for roofers
Updated October 2026. General information, not tax or legal advice.
A roof quote should say the area of the roof surface, the pitch, and how you will get up there. The floor plan is not the area of the sheets, and a gutter is not included just because you were on the roof.
The sample is a single-storey granny flat: metal sheet, measured on site, plus the gutters. The names and the ABN are examples. Copy the lines, then put your own material, your pitch and your access on them.
Sample
Example only. One granny flat, not a whole house. Unit prices exclude GST. The preview adds GST at 10%. Not a rate card, and not a real business.
Unley Roof Co
ABN 51 824 753 556 · 0407 555 019 · jobs@unleyroof.example
8 Arthur Street, Unley SA 5061
Sample
Quote
Q-2276
Issued
22 Oct 2026
Valid until
21 Nov 2026
Quote no.
Q-2276
Prepared for
S. Marinos
31 Mary Street, Unley SA 5061
smarinos@mail.example
Job site
31 Mary Street, Unley SA 5061
| Description | Qty | Price | Amount |
|---|---|---|---|
| Metal roof sheet, supply and fix, including flashings, sq m | 28 | $62.00 | $1,736.00 |
| Sarking and new battens, sq m | 28 | $24.00 | $672.00 |
| Ridge and barge capping, m | 14 | $38.00 | $532.00 |
| Scaffold and edge protection, single storey | 1 | $860.00 | $860.00 |
| Quad gutter on the existing fascia, m | 16 | $45.00 | $720.00 |
| Downpipes to the existing stormwater, each | 2 | $110.00 | $220.00 |
Unit prices exclude GST.
Total includes GST of $474.00.
- Subtotal
- $4,740.00
- GST (10%)
- $474.00
- Total AUD
- $5,214.00
Notes
Measured on site on 22 Oct 2026. Granny flat, single storey. Roof surface 28 sq m at 22 degrees, not the floor plan. Metal sheet. A steeper pitch, a second storey, or concrete tiles is a new price. Scaffold to the eaves is included. A crane, a long carry, or no place to stand the scaffold is extra. Gutters are 16 m of quad and two downpipes. New fascia, valleys, and a skylight are not included. If the existing roof is asbestos cement we stop and re-quote. Old roofing leaves the site.
Terms
This quote is valid for the period shown. Prices are in Australian dollars and, where GST is applied, unit prices exclude GST. Work starts after written acceptance. Variations to the scope are quoted separately.
Roof area and pitch
Measure the roof you will cover, not the rooms underneath it. Write the pitch beside the area so someone else can see what you priced.
- Square metres of roof surface, each plane, including a verandah. Hips and valleys add area and add cuts.
- The pitch, in degrees or as rise over run. A steeper roof has more sheet or tile than the plan of the house, and it changes the fixings and the way you work.
- Which roof. A granny flat is not the house, and a garage is not both.
- If you priced it from the street, call it an estimate or write the assumptions. A measure on the roof is the quote.
Access, scaffolding and safety
Getting on the roof is part of the price. Scaffold to a single-storey eave is not a second storey, and it is not a crane.
Work where a person can fall is regulated. Under the model work health and safety laws used in most of Australia, construction work with a risk of falling more than 2 metres is high risk construction work, and it needs a safe work method statement before you start. Victoria writes its own occupational health and safety rules, and they still cover falls. Check the regulator for the state the roof is in. This page is not a safety method. A line on the quote does not replace edge protection.
- Scaffold, edge protection, or the access you will actually use: its own line, or a written exclusion that says who provides it.
- Where the scaffold stands, and whether a ute can get to the site. A long carry is extra.
- Storeys. Write “single storey” only when that is what you saw.
Materials
- Sheet or tile, the profile and the colour, and who supplies them. Client-supplied sheets are install only.
- Sarking, battens, an insulation blanket, ridge, barge and valleys. Each one you are doing is a line. Each one you are not doing is a note.
- Flashings at the walls and any penetration. A flue, a whirlybird or a skylight is extra unless you priced it.
- Taking the old roof off, and whether the rubbish leaves the site. If it might be asbestos cement, do not price the strip as ordinary rubbish. Stop and re-quote. Removal rules depend on the state. This page is not the removal method.
Gutters
Gutters are linear metres. Write the profile, the metres, and how many downpipes. A quad gutter on a sound fascia is not new fascia, and it is not a new stormwater drain across the yard.
In some states gutters, downpipes and the flashings that carry water are roof plumbing, and they need a plumber’s licence, while the tiles or the sheets sit on a different building licence. The split is not the same in every state and it changes. Check the building authority and the plumbing regulator where the job is. Only describe the work your licence covers.
Write yours in Docket
Copy the lines into your own quote, with your prices and your exclusions. Docket writes the quote and the PDF. Choose Convert to invoice and the same lines become the invoice. The document stays in this browser.
Try Docket free. The free plan is 5 jobs a month, counted in this browser when you download the PDF or turn the quote into an invoice. The quote and its invoice count as one. Pro is A$12 a month or A$99 a year, including GST.
If you are registered for GST, leave unit prices ex GST. With GST on, the PDF adds 10%, and the invoice is titled Tax Invoice. If you are not registered, turn GST off. The GST guide on this site has the longer version, and it is general information, not tax advice.
Short answers
Do I quote the floor plan or the roof?
The roof surface, in square metres, with the pitch written beside it. Hips, valleys and a verandah change the area. The sample is 28 square metres at 22 degrees on one granny flat. It is not a method for measuring every house.
Should scaffolding be on the roof quote?
If the job needs it, price it, or write that access is excluded and who is providing it. Say whether the roof is single storey. A quote that never mentions how you get up is the one that moves on the day.
Are gutters included when I re-roof?
Only if you say so. Give them metres, a profile and a downpipe count, or exclude them. In some states that work needs a plumbing licence. Check the regulator where the job is.
Can I use the sample prices on a real roof?
No. The figures show the shape of the lines. They are not a rate card. Measure the roof and use your own prices.
Use your own name on the next one.
Start a free quote